| 注册
home doc ppt pdf
请输入搜索内容

热门搜索

年终总结个人简历事迹材料租赁合同演讲稿项目管理职场社交

XX工程合同(中英文版)

徐***计

贡献于2020-10-07

字数:8635



xxx engineering contract
xxx工程合


Contract No
合编号:



Party A xxxCompany Limited
甲方:xxx限公司
Party Bxxx Company Limited
乙方:xxx限公司






This contract is made and entered into on the day of 2014 by the following Parties in
合2014年 月 日事方 签署
Party A xxx Company Limited
甲方:xxx限公司xxx营公司住xxx(称甲方)法定代表:xxx
Party B xxx Company Limited
乙方:xxx限公司家xxx营公司注册址:xxx(称乙方)法定代表:xxx
Party A and Party B are called by a joint name of Both Parties under this contract each of which is called as A Party
甲方乙方合项统称双方单独称方
1 Work Content and Requirements
1 工作容求
11 In accordance with the items stipulated in this Contract Party B shall conduct the project as per the Project standard and quality standard stipulated by Ministry of Engineering of the Union of xx
11 合限定条款乙方应xx工程部规定建筑标准质量求执行工程
2 Contract Period
2 合期限
21 Work period for the Road Construction Project the work shall be completed within 2 month upon signing the Contract The condition of handover is that the Project Inspection & Acceptance Team constituted by Party A shall issue the Inspection & Acceptance Sheet after onsite inspection
21 次工程时间周期:合签订14工作日完成甲方组成竣工验收组现场检验出具验收单竣工交接条件
22 This contract shall be implemented after this is duly signed by the legal representatives or authorized representatives of the Parties and stamped with the seals of the Parties and closed after the onsite acceptance of the Project and Contract payment
22 合双方法定代表授权代表签字盖章生效现场验收合格款项支付完毕关闭
3 Health Safety and Environment Principles (HSE)
3 健康安全环境原(HSE)
31 The staff from Party B shall follow the arrangement of Local government and Party A (or its representatives) and comply with the laws and regulations of Myanmar as well as rules and regulations on Health Safety and Environment (HSE) of Party A
31 乙方工作员必须听方政府甲方员(代表)安排遵守缅甸法律法规甲方安全环境健康规章制度等
32 Before or during the implementation of this Project Party B shall acknowledge avoid and prevent the possible damage of the Project to the surrounding environment and other affiliated facilities and the resulting losses shall be borne by Party B
32 工程实施前进行中乙方应识工程周边环境原设施造成危害应进行规避防护带损失应乙方承担
33 During the performance of this Contract Party B shall bear the personal and property losses of Party B or Party B’s personnel injury by itself if the losses are not caused by Party A
33 合履行程中发生非甲方原导致乙方乙方员身财产损失乙方行承担
4 Contract Price Payment and Taxes
4 合价格付款事宜税费
41 As per the stipulated construction contents both Parties agree that this Contract is a lump sum contract The contract payment includes all construction costs and related cost for construction preparation and construction implementation Please refer to the following table for the details
41 合确定工程容甲方乙方确定次马德岛岗亭工程费总包合合费包含全部工程施工费工程准备工程执行相关费详见表

警务室预算报表(USD)
NO
particular
Qity
Rate(usd)
Amount(usd)
1




2




3




4




5




6




7




8




9




10




11




12


 

 


 
 






NO




1




2




3




4




5




6




7




8




9




10




11




12


 

13


 

14


 

 


 
 

NO




1




2




3




4




5






The total amount
费合计:xxx美金
42 The Contract shall be valued in USD and the payment shall be settled in equivalent value of KYAT The exchange rate shall be at the spot exchange rate from USD to KYATon the day of payment by the handling bank of Party A Unless otherwise specified by Party B and agreed by Party A Party A shall only conduct payment in accordance with the bank account of Party B agreed in this contractParty B shall be responsible for the authenticity safety and accuracy of its designated account information If Party A fails to pay or delays payment due to the causes of Party B’s account all responsibilities and consequences hereof shall be undertaken by Party B itself The account information assigned by Party B is as follows
42 合美金计价美元等值缅币结算汇率付款银行付款天美元兑缅币时汇率非乙方特说明甲方意甲方仅合约定乙方银行帐号付款乙方应指定账户信息真实性安全性准确性负责乙方账户原造成甲方付款付款迟延引起切责果乙方承担乙方指定账户信息:


Account Name
账户名:

Account Number
账号:

Beneficiary’s Bank
收款银行:

SWIFTBIC Code
银行国际代码:

Correspondent Bank
代理银行:

Swift Code of Correspondent Bank
代理银行国际代码:

Address
址:

Tel
电话:

43 Both Parties shall perform their respective taxation obligations in accordance with the tax laws and regulations of the Union of Myanmar The Contract Price includes withholding tax and other taxes of Party B
43 合签约双方应缅甸国家相关税收法律法规履行纳税义务乙方合总价中包含预扣税税费部分
44 The payment of this Contract shall be conducted in three instalments
44 合付款次付清付款方式电汇
Within 10 working days after signing this Contract Party A shall make the first payment equals to 30 of the total Contract Price
验收合格甲方乙方支付全部合金额

5 Alterations
5 变更事宜
51 Party A shall have the right to require increasing the work scope (hereinafter referred to as Alterations) on the basis of this Contract
51 甲方权合基础求增加工作范围(称变更)
52 All the requirements on alteration shall be in the written form clearly defining necessary alterations Party B shall submit corresponding work plan working hours and cost estimates according to the alterations proposed by Party A within 3 working days for the approval of Party A
52 变更求均应书面方式清楚指明需变更容乙方应三工作日甲方提出变更提交相应工作计划工时费估算供甲方审批
6 Termination of Contract
6 合终止
61 If the termination of this Contract is caused by Party A Party A shall pay reasonable fees to Party B for the Work (including preparatory work) completed by the date of termination of this Contract Otherwise if the termination of this Contract is caused by the breach of Party B Party A shall not pay for the expenses generated
61 甲方终止合情况甲方应支付乙方截止合终止日时已完成工作(含准备工作)项工作已发生合理费乙方违约导致合终止甲方已发生费予支付
7 Responsibilities & Duties
7 责义务
71 Party A and Party B shall guarantee each other that one party shall provide support to and protect the other party from any loss claim or responsibility caused by or related to this Contract under the following conditions
71 甲方乙方均应相互保证保护支持方发生情况时受合相关产生形式损失索赔责:
a) Injuries and deaths of any employee representative or subcontractor’s personnel
a) 职员代表分包方员伤亡
b) Property loss of staff representatives or subcontractor’s personnel
b) 职员代表分包方员财产损失
c) Expenses losses or damages indirectly or directly caused by significant special or accidental event no matter how it occurs and which form it takes
c) 重特殊意外(直接间接)造成费损失损坏发生种形式
72 Each party shall be responsible for the loss of any third party caused by its own intention or faults and undertake related indemnification obligations
72 双方应意失造成第三方损失负责承担相关赔偿义务
73 If either party of this Contract has realized any possible accident during the performance of the Contract that cannot be executive the other party shall be notified immediately
73 果合双方意方合履行程已意识出现意外导致合法执行情况时应立通知方
74Party B shall procure the insurances and bear the premiums in accordance with the provisions relating to insurance as specified in the laws of the Union of Myanmar Party B shall ensure that the aforesaid insurances remain effective during the period of validity of this Contract All the expenses arising from the aforesaid insurances shall be included in the service fees under this Contract and shall be borne by Party B
74 乙方应根缅甸联邦相关保险法规规定办理项保险承担项保险费乙方应确保述保险合效期间持续效办理述保险发生费应包含合项总费中乙方行承担
8 Force Majeure
8 抗力
81 Force Majeure refers to the events that cannot be predicted by either party of the Contract and their occurrence and consequences cannot be avoided including but not limited to wars unrests fires and natural disasters such as wind rain and earthquake etc
81 抗力指合方预见发生果避免法控制事件包括限战争动乱火灾风雨震等然灾害
82 Any party shall timely notify the other party when it is unable to perform the Contract due to Force Majeure After gaining the certificate of related authority the performance of the Contract could be delayed or suspended temporarily Each party shall notify the other party of actual conditions and continue to 10perform the Contract after the end or disappearance of Force Majeure Both Parties can be exempted from some parts or all of the liabilities for breach of the Contract according to the actual conditions Necessary remedial measures shall be adopted to reduce the loss to the minimum
82 方抗力履行合时应时方通报取关机关证明允许延期履行者暂时履行合方应实际情况通知方 抗力停止消失继续履行合双方根情况部分者全部免予承担违约责采取必补救措施损失降低程度
9 Applicable Laws & Dispute Resolution
9 适法律争议解决方式
91 The laws of Myanmar shall apply to the signing performance and explanation of this Contract
91 合签订履行解释均适缅甸联邦法律
10 Appendix to the Contract and Others
10 合附件事项
101 The appendix to this Contract shall be an integral part of this Contract and shall have the same legal effect as the Contract
101合附件合效组成部分合等法律效力
102 In respect of any matters unmentioned herein written complementary agreement shall additionally be entered into by both parties after mutual agreement The written complementary agreement shall be integral part hereof and shall have the same legal effect as the Contract
102合未事宜双方友协商行签订书面补充协议该书面补充协议作合组成部分合具等法律效力
11 Language
11 语言
The Contract shall be written by English and Chinese
合英文中文书写
12 Copies and Execution of Contract
12 合份数生效
The Contract shall be made in quadruplicate with the same legal effect and Both Parties shall hold two original copies respectively This Contract shall take effect after it has been signed and sealed by legal representatives or authorized agents of Both Parties with the witness of Superintendent (Witness)
合式肆份双方执贰份具等法律效力合双方法定代表授权代表签字盖章生效

Party A
甲方:
Party B
乙方:
Legal Representative
法定代表:
Legal Representative
法定代表:
Authorized Representative
授权代表:
Authorized Representative
授权代表:
Tel电话:
Tel电话:
Fax传真
Fax传真:
Postcode邮编
Postcode邮编
Place:点:
Place:点:
Date 日期 2014年 月 日
Date日期 2014年 月 日






— END —

文档香网(httpswwwxiangdangnet)户传

《香当网》用户分享的内容,不代表《香当网》观点或立场,请自行判断内容的真实性和可靠性!
该内容是文档的文本内容,更好的格式请下载文档

下载文档,方便阅读与编辑

文档的实际排版效果,会与网站的显示效果略有不同!!

需要 10 香币 [ 分享文档获得香币 ]

该文档为用户出售和定价!

购买文档

相关文档

xxx工程合同中英文版

xxx engineering contractxxx工程合同Contract No.: 合同编号: Party A: xxxCompany Limited甲方:xxx有限公司Party B:xxx Company Limited乙方:xxx有限公司This contract is made and entered

A***A 12年前 上传554   0

国际工程合同及其在管理中的作用

国际工程合同及其在管理中的作用开栏语:合同在国际工程中占据着中心地位,体现了相关的法律法规和惯例,规范了当事人的权利、责任与义务以及工程实施过程中的风险分担,是国际工程参与各方实施工程管理的基本依据。合同的签订和管理是搞好国际工程项目的关键。没有合同意识,项目整体目标不明;没有合同管理,项目不可能实现预期目标。  国际工程是指一个工程项目的策划、咨询、融资、采购、承包、管理以及培训等阶段

新***厅 11年前 上传711   0

工程造价管理中的合同管理

工程造价管理中的合同管理  摘要:建设工程合同是承包人进行工程建设,发包人支付价款的合同。建设工程合同包括工程勘察、设计、施工、监理等合同。建设工程合同是工程承发包双方实现市场交易的重要方式和依据。《建筑法》、《合同法》和《质量管理条例》对于建设工程合同都做出了明确的规定。其要点有:   建设工程的发包单位和承包单位应当依法订立书面合同。《合同法》明确规定,建设工程合同应当采取书面形式。因此

h***5 8年前 上传696   0

英文版买卖合同

英文版买卖合同  CONTRACT   Contract No.:   The Buyers:  The Sellers:  This contract is made by and between the Buyers and the Sellers; whereby the Buyers agree to buy and the Sellers agree to sell t

h***y 10年前 上传562   0

劳务合同英文版

EMPLOYMENT CONTRACTContract No.: AWG2012008Employer (Party A): Access World Group LimitedEmployee (Party B): Zibo WangThis Employment Contract is made and entered into on the da

a***n 10年前 上传583   0

英文版销售合同

英文版销售合同CONTRACT Date: Contract No.: The Buyers: The Sellers: This contract is made by and between the Buyers and the Sellers; whereby the Buyers agree to buy and the Sellers agree to sell the

s***u 9年前 上传558   0

英文版的买卖合同

英文版的买卖合同  contract no.:   the buyers: the sellers:  this contract is made by and between the buyers and the sellers; whereby the buyers agree to buy and the sellers agree to sell the under-ment

游***尽 11年前 上传410   0

2017年中外合资经营合同格式附英文版

中外合资经营合同格式附英文版  第一章 总 则  中国_____公司和_____国_____公司,根据《中华人民共和国中外合资经营企业法》和中国的其它有关法律法规,本着平等互利的原则,通过友好协商,同意在中华人民共和国共同投资举办合资经营企业,特订立本合同。  【章名】 第二章 合 资 双 方  第一条 合资合同双方  合同双方如下:  1.1.“中国_____公司”(以

火***静 6年前 上传355   0

浅议工程项目管理中的合同管理

浅议工程项目管理中的合同管理  摘要:合同管理是工程项目管理的主要内容,是降低工程造价、提高经济效益、预防经济风险、保证工程质量的有效途径。注重对合同管理的研究,建立符合中国实际的合同管理为核心的项目管理体系,是达到提高项目管理水平的必经之路。  关键词:工程项目管理 合同管理  0 引言  随着我国经济的快速发展,工程建设正以前所未有的速度发展,工程建设市场也日趋完善和成熟,工

大***3 10年前 上传570   0

论工程项目管理中的合同与法律

论工程项目管理中的合同与法律随着中国改革开放活动的进一步深入,借助加入世界贸易组织(WTO)的契机,中国的施工企业正在从国内市场走向国际市场,承揽了很多国际工程,与国际上许多大型施工企业开展了方方 1方方面面的深层次合作,这使得中国企业所进行的工程项目管理正在向大型化,国际化发展。 为了适应工程项目管理的发展趋势,国内正在大力探索工程项目管理的相关理论,在此过程中,工程界早就已经认识

s***8 10年前 上传575   0

FIDIC合同中咨询工程师的地位

FIDIC合同中咨询工程师的地位FIDIC是国际咨询工程师联合会的简称,由其编制的土木工程施工合同条件是国际工程界的经验总结,是一种行之有效的标准合同管理方法,已被大多数国际承包项目所采纳,有人甚至称之为土木工程行业的圣经。FIDIC合同虽然主要用于国际工程承包,但它的文本只要稍加改动就可以用在国内工程。学习和使用FIDIC合同对于提高我国工程建设的管理水平有十分重要的意义。FIDIC合

x***1 10年前 上传523   0

英文版租房合同样本2021

英文版租房合同样本2021this agreement of lease is made on this 16th day of december __ by and between:-mrs. ghazala waheed w/o abdul waheed, adult, r/o house no.___-_, dha, lahore cantt, (hereinafter to as

一***9 3年前 上传719   0

2018年英文版合同4篇

英文版合同4篇本文目录1. 英文版合同2. 房屋租赁合同英文版3. 英文版借款合同4. 英文版房屋租赁合同范本  this agreement of lease is made on this 16th day of december XX by and between:-  mrs. ghazala waheed w/o abdul waheed, adult, r

x***m 5年前 上传489   0

国际贸易合同英文版

国际贸易合同英文版 CONTRACT NOTE This contract is made on 6.10.1995 day of THE TAIWAN TARDING CO.,LTD as Seller and MANILA TRADING CO. as Buyer. All parties agree to the sale and purchase of Cotton thread u

h***1 14年前 上传18123   0

房屋租赁合同英文版

房屋租赁合同英文版  出租方(甲方)lessor (hereinafter referred to as party a) :  承租方(乙方)lessee (hereinafter referred to as party b) :  根据国家有关法律、法规和有关规定,甲、乙双方在平等自愿的基础上,经友好协商一致,就甲方将其合法拥有的房屋出租给乙方使用,乙方承租使用甲方房屋事宜,订

s***6 11年前 上传602   0

XX工程公司集体合同

××工程公司集体合同 为明确企业经营者和生产者各自的责任和义务,协调两者之间的利益关系,充分调动两者的积极性,促进和保证企业经营目标的实现,督促经营者在发展生产的同时,努力改善职工的物质文化生活,经商定,签订2001年度集体合同。 第一条 承包指标 (一) 经济技术指标 1. 全年实现利润总额1050万元,比1987年经理任期目标840万元增长25%。 2. 完成施工产值1500

w***r 9年前 上传26993   0

XX工程大学XX项目采购购销合同书

XX工程大学XX项目采购购销合同书甲方:          电  话:        传  真:        地  址:          乙  方:          电  话:        传  真:        地  址:          项目名称:                     采购编号:          根据XX项目的采购结果,按照《

教***心 8个月前 上传230   0

谈谈合同网络架构在工程管理中的作用

谈谈合同网络架构在工程管理中的作用在工程管理过程中,建立合同网络架构是一项十分重要的工作。本文拟从项目管理的角度,探讨如何在建设工程的管理中有效建立合同网络,从而充分发挥合同网络图在项目建设中的作用。一、建立合同网络架构的必要性在工程实践中,业主与承包商之间存在着复杂的合同关系。无论是主动还是被动,业主与众多的承包商、设备供应商之间都会签订许多合同,形成许多合同关系。工程管理搞的比较好的项目

博***学 8年前 上传384   0

FIDIC合同条件在小浪底工程中的实践运用

FIDIC合同条件在小浪底工程中的实践运用小浪底水利枢纽工程位于黄河干流,处在控制黄河水沙的关键位置,枢纽主要由大坝、泄洪系统和引水发电系统组成。其开发目标是以“防洪、防凌、减淤为主,兼顾供水、灌溉和发电,综合利用,除害兴利“。   小浪底水利枢纽工程部分利用世界银行的贷款。项目管理实行业主负责制、建设监理制、招标投标制,按照FIDIC土木工程施工合同条件,对工程实施严格的合同管理。业主

p***y 9年前 上传364   0

关於国际承包工程中FIDIC合同条款的应用

关於国际承包工程中FIDIC合同条款的应用自1987年起我开始在海外的世界银行贷款项目中接触并使用 FIDIC,一直至今。必须承认,FIDIC的条款读起来,十分枯燥无味,有时甚至可能感到很深奥。如果初次接触,更令觉得无从下手。现在世界上使用范因较广的除FIDIC外,还有ICE合同条款(以下称ICE)。实际上, FIDIC是从ICE演变来的,香港主要是用ICE的变形。要想在国际上搞承包工程,包

寒***冽 12年前 上传566   0

合同管理在建筑工程项目管理中的地位

合同管理在建筑工程项目管理中的地位  一、合同管理职能  合同确定工程项目的价格(成本)、工期和质量(功能)等目标,规定着合同双方责权利关系。所以合同管理必然是工程项目管理的核心。广义地说,建筑工程项目的实施和管理全部工作都可以纳入合同管理的范围。合同管理贯穿于工程实施的全过程和工程实施的各个方面。它作为其它工作的指南,对整个项目的实施起总控制和总保证作用。在现代工程中,没有合同意识则项

冷***观 11年前 上传567   0

建设工程合同签订中的陷阱及防范

· 建设工程合同签订中的陷阱及防范  合同(范本)陷阱及其防范建设工程合同签订中的陷阱及防范   (一)在签订建设工程勘察、设计合同中的陷阱与防范    1.在发包人和承包人条款方面 陷阱:承包人不具备与工程相应资质和法人资格,填写时,真正承包人将自己的上级单位且独具法人资格的单位填为承包人,往往工程质量保证不了。   防范:核对清楚承包人,且审查承包人的工程建设资格和等级。   2.

天***猩 2周前 上传72   0

浅谈合同管理在工程项目建设管理中的作用

浅谈合同管理在工程项目建设管理中的作用【摘要】合同管理是工程项目建设管理的重要组成部分,本文仅从合同类型的选择,招投标过程中合同管理的注意事项,工程计量与支付阶段合同管理的重点,以及竣工决算合同管理的重要性等方面谈点个人体会。 关键词:合同管理合同类型招投标计量支付竣工决算   1.总论   高速公路是一个国家现代化水平的重要标志,是经济发展的产物,从1984年我国修建第一条高速公路(沈

M***3 12年前 上传642   0

浅谈工程项目合同管理中的索赔问题

浅谈工程项目合同管理中的索赔问题  摘要:施工索赔是承包商保护自己并获取正当利益的手段之一,然而,由于目前我国市场还不完全规范,法制还不够健全,不论是业主、监理单位还是承包商,对如何运用索赔手段来维护自身正当权益的认识尚不足。文章试图通过对索赔的认识及有关问题的探讨,提高各方的索赔意识,以促进工程项目合同管理中的索赔问题的规范化。  关键词:工程项目;合同管理;索赔  一、引言 

梅***然 9年前 上传457   0

建设工程合同签订中应注意的问题

建设工程合同签订中应注意的问题建设工程合同签订的方式有两种:一是协商方式即由双方当事人通过协商签订建设合同,二是通过招标投标的方式。招标投标是国际经济交往和国际贸易中普遍采用的一种交易方式,近年来在我国国内经济交往中尤其是在各种工程建筑项目中逐渐采用,这主要是因为它具有科学性、效益性、公平性和安全性等优点,它是商品经济高度发达的产物,是市场经济的一种竞争机制。(一)通过公开招标的形式,谁家公

卖***妈 8年前 上传440   0