| 注册
home doc ppt pdf
请输入搜索内容

热门搜索

年终总结个人简历事迹材料租赁合同演讲稿项目管理职场社交

CONTRACT FOR PROJECT INSTALLATION

s***n

贡献于2015-12-14

字数:4637

CONTRACT FOR PROJECT INSTALLATION
  this contract for project of installing main engine is made on_________ by and between _________ company ltd (here inafter called party a) and _________ company ltd (hereinaftercalled party b)
  1name of installation work _________
  2location of installation work party a's_________in port a
  3scope of installation work as specified in the drawingsand statement attached
  4time limit for completion
  the installation work shall cordinate with the construction of _________ in party a and shall be completed including thetrial run for _________ within _________days after the completion of _________
  5total price of installation work_________us d only
  6payment terms of installation work
  first installment
  party a shall pay to party b fifteen percent of the total pricefor installation work ie_________usd only when thiscontract comes into effect
  second installment
  party a shall pay to party b fifteen percent of the total pricefor instalatiorn work ie_________u s d only at the commencement of construction installation
  third installment
  party a shall pay to party b ten percent of the total pricefor installation work ie_________u s d only duringthe installation of pipes
  fourth installment
  party a shall pay to party b forty percent of the total pricefor installation work ie_________u s d only at thetime when the main equipment arrives at the site
  fifth installment
  party a shall pay to party b ten percent of the total pricefor installation workie_________u s d only upon comple tion of the installation work
  sixth installment
  party a shall pay to party b ten percent of the difference of the price for installation work ie_________u s d only after the work received has been proved qualified
  7penalty for default
  in the event party b shall fail to complete the work in timeowing to reasons that party b shall be held liable party b shallpay a penahy for such defauh based on one out of a thousand of the total price for installation work per day ie_________usd only for each day of such default
  8increase or decrease of work
  in case party a has to amendincrease or decrease the working schedule the corresponding increase or decrease of total priceshall be evaluated according to the terms and conditions betweenthe two parties should the work be increased the parties shallenter into an agreement for the unit price of additional items should any part of the completed work of any part of the materi als transported to the site have to be abandoned owing to amend ment made by party a party a shall after having received thework pay for each completed work or materials abandoned as perthe unit price specified to party b
  9supervision for progress
  the supervision personnel appointed by party a and its rep resentative shall have the authority to supervise the progress or'work and give instruction party b shall perform correctly in ac cordance with such instruction given by party a's personnel orrepresentative
  10stopage work
  should party a notify party b to stop the work for reasonsbeyond the responsibility of party b party b can stop the workand claim from   party a the price of finished work materials atsite and other reasonable expenses to be added or deducted fromthe paid installments
  11custody of work
  the completed work and the materials tools and equipment at site shall be under the custody of party b after commencement and before completion and delivery of the work unless in the event of force majeure party b shall be fully responsible for any damage of the work under the custody of party b in case of force majeure party b shall give a list of damage according to the actual condition and suggest an expected price and date forrecovery from such damage to party a for checking and paymentshould party a decide not to continue with the work thiscontract shall be terminated according to article 10 hereof
  12warranty for work
  party b shall warrant the promised condition of the work within _________ year(s) after the date of receiving the work by party a however party b shall not be liable to acts of god or misuse of the work by party a
  13supplemental provisions
  party b shall be held responsible if party a's personnel or other people is injured due to the negligence of party b duringthe progress of construction however such responsibility shallrest upon party a if the injury caused is due to the negligence of party a of technicians contracted with party a
  14attachments
  attachments shall become an integral part of this contractand shall be as effective as any other provisions attachments include
  (1) drawings
  (2) an estimate of cost
  15format of this contract
  the contract shall be in duplicate with two texts to be heldseparately by the parties hereof each of the parties shall alsokeep two copies of the contract for record
  16additional provision
  maintenace of main engine
  party b shall provide free periodic maintenance service forthe main engine of _________ for _________ year(s) after the receiving of the work by party a and send maintenance personnel every _________month(s) for performing maintenance
  this contract has been executed by the parties as of the day and year first above written
  party a_________           party b_________
  by______________             by_____________
  address_________           address_________
  date____________           date____________
文档香网(httpswwwxiangdangnet)户传

《香当网》用户分享的内容,不代表《香当网》观点或立场,请自行判断内容的真实性和可靠性!
该内容是文档的文本内容,更好的格式请下载文档

下载文档,方便阅读与编辑

文档的实际排版效果,会与网站的显示效果略有不同!!

需要 2 积分 [ 获取积分 ]

购买文档

相关文档

project procedure

project procedure1.0 PURPOSEThe purpose of this procedure is to identify the positions and organizational responsibilities within Engineering Department.2.0 SCOPEThis procedure is applicable

吸***血 9年前 上传517   0

AGREEMENT OF BOT PROJECT

AGREEMENT OF BOT PROJECT  this agreement is made and entered into by and between the government of_____________(hereinafter called 'b') represented by________(hereinafter called 'a') and __________

d***w 10年前 上传462   0

CONTRACT FOR PROCESSING

CONTRACT FOR PROCESSING  messrs: _________________________________  industry ltd. (hereinafter called party a)   and   industry ltd. (hereinafter called party b)   have agreed that party b

c***g 11年前 上传568   0

ENTERTAINMENT CONTRACT

ENTERTAINMENT CONTRACT  this contract, made this___ day of _________, ____, by and between middle tennessee state university (institution) and?____________(contractor).  w i t n e s s e t h  wh

l***3 11年前 上传602   0

Purchase Contract

Purchase Contract  (contract no.): _______________  (date) :_______________________  (signed at) :__________________  the buyer:_____________________  address: ______________________  (te

B***y 11年前 上传407   0

Labour Contract

Labour Contract  employer:__________________________  legal representative:_________________   position:_________    president:________   address:__________ post code:_______  employee:____

m***3 9年前 上传497   0

LOAN CONTRACT

LOAN CONTRACT  contract number:_____________________  borrower:____________________________  address:_____________________________   lender: _____________________________   address:________

A***5 8年前 上传522   0

项目管理与Project 2007的关系

项目管理与Project 2007的关系  在项目管理知识体系中,包括九大知识领域(范围管理、时间管理、费用管理、质量管理、人力资源管理、沟通管理、风险管理、采购管理、整体管理)。但从项目管理辅助工具软件Project 2007来说,它包含了这九大知识领域中的5大核心领域,另外4个领域需要通过其它辅助工具或人工操作来完成。包括的5大领域如下所述:  1. 范围管理  项目管理的第一个

1***1 14年前 上传446   0

CONTRACT ON RETAINING LEGAL COUNSEL

CONTRACT ON RETAINING LEGAL COUNSEL  ______(以下简称甲方)因工作需要根据《中华人民共和国律师法》的有关规定,聘请________(以下简称乙方)的律师为法律顾问,经双方协商订立下列协议,共同遵照履行。   ________('a' hereinafter) would like to retain ________('b' hereinafte

l***m 9年前 上传427   0

Sample Sale Contract

Sample Sale Contract  the sample sale/purchase agreement below is a guide only to the sort of agreement that may be made between the seller and buyer of a horse.?   agreement of sale   this agr

天***3 9年前 上传522   0

contract.management

北京首信股份有限公司合同管理制度 (2001年11月20日北京首信股份有限公司第一届董事会第二次会议通过) 第一条 为加强公司经济合同管理,保障公司合法权益,预防合同纠纷,促进本公司依法经营管理,根据《合同法》、《民法通则》等国家有关法律、法规、制定本制度。 第二条 本制度适用于本公司内部各部门及独立法人单位(各公司)的公司内部和外部经济合同的管理。 第三条 合同管理机构的设置与

小***1 15年前 上传30444   0

PLANT CONSTRUCTION CONTRACT

PLANT CONSTRUCTION CONTRACT  article 1-definitions  'the owner' shall mean .  'the contractor' shall mean .  'the plant' shall mean all or any part of the machinery, equipment andmaterials fo

y***6 11年前 上传554   0

English contract for foreign instructors

English contract for foreign instructors  party a:_____________  party b:_____________  i. party a wishes to engage the service of party b___________________as____________________________. the

陈***欢 9年前 上传567   0

Vendor contract process

行政部Vendor管理程序 Admin Management Procedure       1. 目的 Objective   综述Vendor 管理的主要流程。 To stipulate the master flow of vendor contract process.   2. 适用范围 Scope 行政部Vendors协议的签订和管理。 Signing an

d***3 8年前 上传5119   0

Purchase Contract 进口合同中英文

Purchase ContractCONTRACT NO.: SIGNING DATE: SIGNING PLACE: 买方: 卖方: Buyer: Seller: Tel:

l***i 4年前 上传672   0

labour.contract.management.temporary.way

北京首信股份有限公司全员劳动合同制管理暂行办法 (2001年11月20日北京首信股份有限公司第一届董事会第二次会议通过) 第一章 总 则 第一条 为维护公司和员工的合法权益,建立稳定、和谐的劳动关系,根据《中华人民共和国劳动法》、《北京市实行劳动合同制度的实施细则》及本公司《章程》,结合公司的实际情况,制定本暂行办法。 第二条 劳动合同是公司与员工建立劳动关系,明

q***z 9年前 上传2484   0

货物出口合同(Sales Contract)

货物出口合同(Sales Contract)编 号(No.) :_____________  签约地点(Signed at) :________  日 期(Date) :_____________  卖方(Seller) :________________________  地址(Address) :_______________________  电话(Tel) :__

p***o 11年前 上传568   0

Microsoft-Project-2010 基础教程(完整版)

MS Project 2010基础教程了解 Project 2010Microsoft Project 2010 推出的新功能能够显著地改善您管理、计划和查看项目的方式。 如果您已经熟悉早期版本的 Microsoft Project,则单击此文档中的链接可获得 Project 2010 中新功能和不同之处的相关信息。了解 Project 2010新增功能概括了解 Project

雅***韵 2年前 上传546   0

改变项目风险管理的看法(change the way on project risk management)

改变项目风险管理的看法(change the way on project risk management)摘 要:本文主要从个人对风险的概念、风险的特征、如何识别风险、衡量风险、决策风险等的认识出发,谈谈如何有效地控制风险、哪些因素还应该列入风险因素指标体系中、如何从项目管理风险的角度出发,对项目风险管理过程中的风险问题给个阐述。最后提出综合项目管理和极限项目管理。 关 键 词: 风

V***u 12年前 上传605   0

myGS- Project大型制造行业解决方案-ERP解决方案

myGS- Project大型制造行业解决方案-ERP解决方案  行业背景分析  单件定制和单件小批制造企业一般具有规模大、生产周期长、工艺路线复杂、业务流程重复率低的特点,一个合同下来究竟赚不赚钱、成本是多少、交货期能否保证等等,往往难以预料。因而在这类企业的管理中,质量、成本和交货期的有效控制比在其他类型企业更具有挑战性。该行业主要包括船舶、飞机、大型发电设备、重型工程设备、大型

6***8 12年前 上传517   0

以Project Server为平台建立的项目管理流程-第一章(Part 1)

以Project Server为平台建立的项目管理流程--第一章(Part 1)本章简介:描述MS Project Server 2002的功能特性以及进行软件项目开发的进度控制需要的制度支持。MS Project Server 2002的影响力像MS的其他产品一样被绝大部分项目管理人员追捧。通过这个产品,项目管理人员与项目成员、项目经理等角色能够通过Web站点完成任务信息查看、项目任务

a***t 10年前 上传524   0

施工合同中英文模板-construction-contract

Construction Contract工 程 合 同 PO No.: XXXXXXXBuyer:. Date of signature: 甲方:

k***w 10年前 上传465   0

2018年货物出口合同(Sales Contract)

货物出口合同(Sales Contract)  编 号(no.) :_____________  签约地点(signed at) :________  日 期(date) :_____________  卖方(seller) :________________________  地址(address) :_______________________  电话(tel) :

a***3 6年前 上传423   0

英语教案范例 高中牛津英语 unit3 project 模块一

英语教案范例 高中牛津英语 unit3 project 模块一**师范大学教育实习教案实习生:施萌                                                指导教师:陆萍          实习学校**五中年级和班级高一(8)班学科英语课程题目牛津高中英语(模块一)Unit 3 Project: Making a

w***d 9年前 上传620   0

高中英语牛津译林版 选择性必修第三册Unit 3 Back to the past-Extended reading,Project,Assessment同步课时作业(含答案和解析)

Unit 3 Back to the past Extended reading, Project, Assessment & Further study—2021-2022学年高一英语牛津译林版(2019)选择性必修第三册同步课时作业一、汉译英1.A few weeks later when a tiny chick ________(孵出), her heart was filled

文***7 5个月前 上传136   0