PMP Preparation Overview Updated for PMBOK 2000

f***e

贡献于2010-02-21

字数:16045

PM Area
Area Process
Important Tools and Techniques
Major Deliverables (Outputs)
Process Group
Other Notes
Project Integration Management – Processes required to ensure that the various elements of the project are properly coordinated
Project Plan Development – taking the results of other planning processes and putting them into a consistent coherent document
¨ Project Planning Methodology
¨ Project Plan
Planning
Project Plan should include Project Charter Scope Statement WBS Budget Schedule Risks and others
Project Plan Execution – carrying out the project plan by performing the activities included therin
¨ General Management Skills
¨ Work Authorization System
¨ PMIS
¨ Work Results
¨ Change Requests
Executing
PM’s role is to integrate all pieces of a project into a cohesive whole It is management’s (eg senior management) responsibility to define the project and protect it from changes
Overall Change Control – Coordinating changes across the entire project
¨ Change Control System
¨ Performance Measurement
¨ PMIS
¨ Project Plan Updates
¨ Corrective Action
¨ Lessons Learned
Controlling
PM must be concerned with the following for overall change control
1 Influencing the factors that affect change
2 Ensuring that change is beneficial
3 Determining that a change has occurred
4 Managing changes as they occur

Project Scope Management – processes required to ensure that the project includes all the work required and only the work required to complete the project successfully
Initiation – committing the organization to begin the next phase of the project
¨ Project Selection Methods
¨ Expert Judgment
¨ Project Charter
¨ Constraints
¨ Assumptions
Initiating
Project Manager should be identified in this phase PMI considers this an output
Scope Planning – developing a written scope statement as the basis for future project decisions
¨ Product Analysis
¨ BenefitCost Analysis
¨ Alternatives Identification
¨ Expert Judgment
¨ Scope Statement
Planning
Scope Statement should include
¨ Project Justification
¨ Project Product
¨ Project Deliverables
¨ Project Objectives
Scope Definition – subdividing the major project deliverables into smaller more manageable components
¨ WBS Templates
¨ Decomposition
¨ Work Breakdown Structure
Planning
WBS is used as a basis for many planning activities and is considered very important by PMI


Scope Verification – formalizing acceptance of the projects scope
¨ Inspection
¨ Formal Acceptance
Executing
Scope Verification deals with the acceptance of the work not the correctness of the work Quality Control deals with the correctness of the work
Scope Change Control – controlling changes to the project scope
¨ Scope Change Control System
¨ Performance Measurement
¨ Scope Changes
¨ Corrective Action
¨ Lessons Learned
Controlling
Corrective Action – Anything done to bring expected future project performance into line with the project plan

Project Time Management Processes required to ensure timely completion of the project

Activity Definition – identifying the specific activities that must be performed to produce the various project deliverables
¨ Decomposition
¨ Activity List
Planning
Decomposition here generates activities (action steps) whereas decomposition in Scope Definition generates deliverables
Activity Sequencing – identifying and documenting interactivity dependencies
¨ Precedence Diagramming Method (PDM) aka activityonnode
¨ Arrow Diagramming Method (ADM) aka activityonarrow
¨ Conditional Diagramming Techniques (eg GERT)
¨ Project Network Diagram
Planning
PDM has 4 types of dependencies (FS FF SS SF) ADM only uses FS dependencies

ADM uses dummies PDM doesn’t


Activity Duration Estimating – estimating the number of work periods which will be needed to complete individual activities
¨ Expert Judgment
¨ Analogous Estimating (ie Top Down Estimating)
¨ Simulation
¨ Activity Duration Estimates
Planning
PERT and CPM estimating can only be drawn on an AOA diagram

Critical Path is the longest path through a network diagram and shows earliest completion of a project It can be derived using CPM PERT or Monte Carlo


Schedule Development – analyzing activity sequences activity durations and resource requirements to create the project schedule
¨ Mathematical Analysis
¨ Duration Compression
¨ Simulation
¨ Project Schedule
¨ Schedule Management Plan
Planning

CPM technique provides only 1 estimate per task (ie the most likely)
PERT technique provides 3 estimates (Optimistic (O) Pessimistic (P) and Most Likely (M))
PERT Formulas
¨ (P+4M+O)6
¨ Standard Deviation – (PO)6
¨ Variance – ((PO)6) 2
Schedule Control – controlling changes to the project schedule
¨ Schedule Change Control System
¨ Performance Measurement
¨ Schedule Updates
¨ Corrective Action
¨ Lessons Learned
Controlling
Revisions are a special schedule update which are changes to the start and finish dates in approved schedule They are usually revised only in response to scope changes
Project Cost Management processes required to ensure that the project is completed within the approved budget
Resource Planning – determining what resources (people equipment materials) and what quantities of each should be sued to perform project activities
¨ Expert Judgment
¨ Alternatives Identification
¨ Resource Requirements
Planning

Cost Estimating – developing an approximation (estimate) of the costs of the resources needed to complete project activities
¨ Analogous Estimating (ie topdown estimating)
¨ Parametric Modeling (eg regression analysis and learning curve)
¨ BottomUp Estimating
¨ Cost Estimates
¨ Cost Management Plan
Planning
Analogous estimating is generally less costly and less accurate than other techniques
Bottomup estimating accuracy is driven by size of work items being estimated Smaller items increase both cost and accuracy
Formulas to remember
¨ SV BCWPBCWS
¨ CV BCWPACWP
¨ SPI BCWPBCWS
¨ CPI BCWPACWP

Cost Budgeting – allocating the overall cost estimate to individual work items
¨ Cost Estimating Tools and Techniques
¨ Cost Baseline
Planning
Cost baseline is a timephased budget to measure and monitor cost performance


Cost Control – controlling changes to the project budget
¨ Cost Change Control System
¨ Performance Measurement
¨ Revised Cost Estimates
¨ Budget Updates
¨ Corrective Action
¨ Estimate at Completion (EAC)
¨ Lessons Learned
Controlling
Formulas to remember
¨ EAC BACCPI
¨ ETC EACACWP
¨ VAC BAC – EAC


Project Quality Management – processes required to ensure that the project will satisfy the needs for which it was undertaken
Quality Planning – identifying which quality standards are relevant to the project and determining how to satisfy them
¨ BenefitCost Analysis
¨ Benchmarking
¨ Flowcharting
¨ Quality Management Plan
¨ Checklists
¨ Operational Definitions (ie Metrics)
Planning
Quality The totality of characteristics of an entity that bear on its ability to satisfy stated or implied needs

Customer Satisfaction Conformance to requirements specifications and fitness for use

Quality is planned in not inspected in
Quality Assurance – evaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards
¨ Quality Planning Tools and Techniques
¨ Quality Audits
¨ Quality Improvement
Executing
Kaizen (Continuous Improvement) Small improvements in products or processes to reduce costs and ensure consistency of products or services

ISO 9000 An international standard that describes a recommended quality system Does not include quality procedures or forms

Heuristic is a rule of thumb (eg Rule of Seven)
Quality Control – monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance
¨ Inspection
¨ Control Charts
¨ Pareto Diagrams
¨ Quality Improvement
¨ Acceptance Decisions
¨ Rework
Controlling
¨ + 1 sigma 6826
¨ + 2 sigma 9546
¨ + 3 sigma 9973
¨ + 6 sigma 9999

Variable Characteristic to be measured (eg size shape)
Attribute The measurement (eg inches pounds)
Statistical Independence The probability of 1 event occurring does not affect the probability of another event occurring

Project Human Resource Management – process required to make the most effective use of the people involved with the project
Organizational Planning – identifying documenting and assigning project roles responsibilities and performing relationships
¨ Stakeholder Analysis
¨ Human Resource Practices
¨ Organizational Theory
¨ Role and responsibility assignments
¨ Staffing Mgmt Plan
¨ Organization Chart
Planning
PM Forms of Power
¨ Formal (legitimate) – Based on Position
¨ Reward – Giving Rewards
¨ Penalty (coercive) – Penalizing
¨ Expert – Knowledge and Experience
¨ Referent – Based on referencing someone else’s position and power

PMI says best forms of power are Expert and Reward Formal Reward and Penalty are derived from PM’s position in organization
Staff Acquisition – getting the human resources needed assigned to and working on the project
¨ Negotiations
¨ Preassignment
¨ Procurement
¨ Project Staff Assigned
¨ Project Team Directory
Planning
Conflict Resolution Techniques
¨ Problem Solving (Confronting)
¨ Compromising
¨ Withdrawal
¨ Smoothing
¨ Forcing

PMI recommends Problem Solving as best choice followed by compromising Forcing is last
Team Development – developing individual and group skills to enhance project performance
¨ Team Building Activities
¨ Reward and Recognition Systems
¨ Collocation
¨ Training
¨ Performance Improvements
Executing
Maslow’s Hierarchy of Needs (in order)
¨ Physiological (Lowest)
¨ Safety
¨ Social
¨ Esteem
¨ SelfActualization (Highest)

MacGregor’s Theory X – People need to be watched every minute They are incapable avoid responsibility and avoid work
MacGregor’s Theory Y – People are willing to work without supervision and want to achieve
Project Communications Management – processes required to ensure timely and appropriate generation collection dissemination storage and ultimate disposition of project information
Communication Planning – determining the information and communications needs of the stakeholders who needs what information when will they need it and who will give it to them
¨ Stakeholder Analysis
¨ Communications Management Plan
Planning
Communications Mgmt Plan may include
¨ What info needs to be collected & when
¨ Who will receive the info
¨ Methods to gather and store info
¨ Who may talk to whom
¨ Reporting relationships
¨ Schedule for distribution of each comm


Information Distribution – making needed information available to project stakeholders in a timely manner
¨ Communication Skills
¨ Information Retrieval Systems
¨ Information Distribution Systems
¨ Project Records
Executing
Communication Methods
¨ Formal Written – Project PlansCharters
¨ Formal Verbal – Presentations Speeches
¨ Informal Written – Memos email
¨ Informal Verbal – Meetings Conversations

Comm Channels N(N1)2 where N is equal to the number of people
Performance
Reporting – collecting and disseminating performance information This includes status reporting progress measurement and forecasting
¨ Earned Value Analysis
¨ Performance Reviews
¨ Variance Analysis
¨ Trend Analysis
¨ Performance Reports
¨ Change Requests
Controlling
Performance Reporting Tools
¨ Status Report
¨ Progress Report
¨ Trend Report
¨ Forecasting Report
¨ Variance Report
¨ Earned Value**
Administrative Closure – generating gathering and disseminating information to formalize phase or project completion
¨ Performance Reporting Tools and Techniques
¨ Project Archives
¨ Formal Acceptance
¨ Lessons Learned
Closing
Admin Closure should be done for each phase of the project

Inputs include
¨ Performance Measurement Documentation
¨ Documentation of the product of the project
¨ Other project records
Project Risk Management – processes concerned with identifying analyzing and responding to project risk
Risk Management Planning – deciding how to approach and plan the risk management activities for a project
¨ Planning Meetings
¨ Risk Management Plan
Planning
The risk management plan does not address the response to specific risks (see risk response plan) Elements include
· Methodology
· Roles & Responsibilities
· Budgeting
· Timing
· Scoring & Interpretation
· Thresholds
· Reporting Formats (for Risk Response plan)
· Tracking


Risk Identification – determining which risks are likely to affect the project and documenting the characteristics of each
¨ Checklists
¨ Flowcharting
¨ Interviewing
¨ Risks
¨ Risk Symptoms (ie Triggers)
Planning
Types of Risk
1 Business – Risk of a gain or loss
2 Pure (Insurable) – Only a risk of loss

Sources of Risk Schedule Cost Quality (ie triple constraints) and Performance or Scope of Work


Qualitative Risk Analysis – assessing the impact & likelihood of identified risks prioritizing them based on their impact to the project’s objectives
¨ Risk Probability and Impact
¨ Probability Impact Risk Rating Matrix
¨ Project Assumptions Testing
¨ Data Precision Ranking
¨ Overall Risk Ranking for the project
¨ List of Prioritized risks
¨ List of risks for additional analysis & mgmt
¨ Trends
Planning
Use of low precision data may lead to an analysis that is not useable Risks are rated against how they impact the projects objectives for Cost Schedule Scope and Quality

Risks calculated as high or moderate would be prime candidates for further analysis



Project Risk Management (Continued) – processes concerned with identifying analyzing and responding to project risk
Quantitative Risk Analysis – analyze numerically the probability of each risk and its consequence on overall project activities as well as the extent of overall project risk
¨ Interviewing
¨ Sensitivity Analysis
¨ Decision Tree Analysis
¨ Simulation
¨ Prioritized list of Quantitative Risks
¨ Probabilistic analysis of the project
¨ Probability of achieving the cost and time objectives
¨ Trends
Planning
Quantitative analysis follows qualitative analysis It requires risk identification Objectives include

· Determine probability of reaching project objectives
· Determine size of contingency needed
· Identify risks requiring most attention based on their priority
· Identify realistic cost and scope targets
Risk Response Planning – developing options and determining actions to enhance opportunities and reduce threats to project objectives
¨ Avoidance
¨ Transference
¨ Mitigation
¨ Acceptance
¨ Risk Response Plan
¨ Residual & Secondary Risks
¨ Contractual Agreements
¨ Contingency Reserve amounts needed
¨
Planning
Contingency Plan is applied to identified risks that arise during the project A fallback plan is developed if the risk has high impact or if the strategy might not be fully effective Contingency Allowance accounts for known risks

Risks that arise as a result of implementing the contingency plan are called secondary risks


Risk Monitoring and Control – keeping track of identified risks monitoring residual risks and identifying new risks ensuring the execution of risk plans and evaluating their effectiveness in reducing risk
¨ Project Risk Response Audits
¨ Periodic Project Risk Reviews
¨ Earned Value Analysis
¨ Technical Performance Measurement
¨
¨ Workaround plans
¨ Corrective action
¨ Project change requests
¨ Risk database
¨ Updates to risk identification checklists
¨ Updates to risk response plan
Controlling
Purpose of Risk Monitoring is to determine if
· Risk responses implemented as planned
· Risk response actions were as effective as planned
· Project assumptions are still valid
· Risk trigger has occurred
· Risk exposure has changed


Project Procurement Management – processes required to acquire goods and services from outside the performing organization
Procurement Planning – determining what to procure and when
¨ Make or Buy Analysis
¨ Expert Judgment
¨ Contract Type Selection
¨ Procurement Management Plan
¨ Statements of Work
Planning
Main reason to buy (over make) is to decrease risk (cost schedule and performance or scope of work)

Contract Type Selection
1 CR – Cost Reimbursable Buyer bears highest risk for cost
2 FP – Fixed Price Buyer has least cost risk
3 T&M (ie Unit Price) – Time and Materials Buyer has moderate cost risk

Incentives – Help bring seller’s objectives in line with buyer’s objectives
Solicitation Planning – documenting project requirements and identifying potential sources
¨ Standard Forms
¨ Expert Judgment
¨ Procurement Documents
¨ Evaluation Criteria
¨ SOW Updates
Planning
RFP (Request for Proposal) – Requests detailed proposal on how work will be accomplished
IFB (Invitation for Bid) – Requests one price to do all work
RFQ (Request for Quotation) – Requests a price quote per item hour etc

Procurement Documents
¨ Info for sellers
¨ Scope of work
¨ Proposed terms and conditions of contract
Solicitation – obtaining quotations bids offers or proposals as appropriate
¨ Bidders Conferences
¨ Advertising
¨ Proposals
Executing
Things to be aware of in bidders conference
¨ Collusion
¨ Sellers not asking questions in front of competition
¨ All Q&A is put in writing and issued to all potential sellers as an addendum to the procurement docs


Source Selection – choosing from among potential sellers
¨ Contract Negotiation
¨ Weighting System
¨ Screening System
¨ Independent Estimates (ie Should Cost)
¨ Contract
Executing
Objectives of Negotiation
1 Obtain a fair and reasonable price
2 Develop a good relationship with the seller (should be a winwin situation)

Items to negotiate include Responsibilities authority applicable law technical and business mgmt approaches contract financing and price
Project Procurement Management (Continued) – processes required to acquire goods and services from outside the performing organization
Contract Administration – managing the relationship with the seller
¨ Contract Change Control System
¨ Performance Reporting
¨ Payment System
¨ Correspondence
¨ Contract Changes
¨ Payment Requests
Executing
Usually a 3rd party controls the contract and is the only one with authority to change it This can lead to conflict between the project manager and the contracting officer
Contract Closeout – completing and settlement of the contract including resolution of any open items
¨ Procurement Audits
¨ Contract File
¨ Formal Acceptance and Closure
Closing
Centralized Contracting – A separate contracting office handles contracts for all projects

Decentralized Contracting – A contract administrator is assigned to each project

Contract documentation is the only input to Contract Closeout

文档香网(httpswwwxiangdangnet)户传

《香当网》用户分享的内容,不代表《香当网》观点或立场,请自行判断内容的真实性和可靠性!
该内容是文档的文本内容,更好的格式请下载文档

下载文档,方便阅读与编辑

文档的实际排版效果,会与网站的显示效果略有不同!!

需要 2 积分 [ 获取积分 ]

购买文档

相关文档

pmp学习心得

pmp学习心得第一篇:pmp学习心得pmp考试心得三个月紧张而富挑战的pmp备考结束了, pmp考试也是一个理顺项目管理思路的过程,在知识点,尤其是职业道德的理解上要以pmp思路对待,重要的是理解pmi的概念和思想。同时也将如何进行项目管理的水平又提升到一个新的高度,发现了诸多平时工作中存在的问题,也对今后起到了指导与改正的作用,真正是受益匪浅。1. 学到的知识总结pmbok

w***i 10年前 上传507   0

PMP学习心得

PMP学习心得  我参加的XX年1月的培训班,3月23日考试。成绩不算高但庆幸通过了,回顾整个学习,复习,考试各阶段,把自己的经验教训总结分享给各位同学。  01. 提前报名,课前通读一遍。    坦白说,我是属于笨鸟先飞的类型,12月中旬开始看pmbok,从第五章开始看,依据恒佳提供的打印版复习题为线索,根据问题在pmbok中找答案,把每章的问题都看一遍,在书中找一遍答案,基本pm

姜***8 10年前 上传598   0

PMP道德规范

PMI MEMBER ETHICAL STANDARDSMEMBER CODE OF ETHICS The Project Management Institute (PMI) is a professional organization dedicated to the development and promotion of the field of project ma

y***x 9年前 上传461   0

PMBOK第五版(中英文对照)

最近PMI的英文官网已经公布了第五版PMBOK的初稿,针对第四版而言的确有了不少变动。了解这些变动,对理解项目管理知识的整理和发展,以及掌握PMP考试的变化方向都是很重要的。

静***1 5年前 上传2311   0

PMBOK96中文版

PMBOK96中文版第一章 绪论第二章 项目环境管理第三章 项目管理程序第四章 项目综合管理第五章 项目范围管理第六章 项目时间管理第七章 项目成本管理第八章 项目质量管理第九章 项目人力资源管理第十章 沟通管理第十一章 项目风险管理第十二章 项目采购管理第一章 绪论   项目管理知识体系包含了许多内容,它是对项目管理专业知识的一个总结

y***u 10年前 上传438   0

PMBOK之项目采购管理学习

PMBOK之项目采购管理学习组织或项目既可能是买方,也可能是卖方,还可能同时充当买方和卖方的角色.当你是买方的时候你要进行采购规划,准备采购文件,发起招标,选择供应商,进行询价和洽谈,签订合同并对合同进行管理和收尾.当你是卖方的时候要准组织或项目既可能是买方,也可能是卖方,还可能同时充当买方和卖方的角色.当你是买方的时候你要进行采购规划,准备采购文件,发起招标,选择供应商,进行询价和洽谈

懒***虫 8年前 上传475   0

PMP应试六步法

1、 我们既然决定要去考 PMP,那就要做一些前期准备工作了,我自己事先在网上看一些关于 PMP 的一些资料,当然这些都是先了解一下,比如:什么是 PMI 协会、有关 PMP考试的相关信息、PMP 考试报名的相关条件、PMP 培训的机构等等,初步了解之后,就尽量早报名,这样可以早拿到资料和老师的提供的学习计划,这样可根据这些资料和老师的计划安排好自己的计划;  2、那么,接下来我来谈谈如

h***j 10年前 上传659   0

PMP培训学习心得

PMP培训学习心得  section 1学习篇  pmp考试不是你背书有多厉害就能通过,而是重在理解。考试能获得越多的p,说明你对项目管理的理解就越接近pmi的思维理念。  两个月时间内,平均每天花3个小时看书,按照老徐的讲义和辅导书,结合自己的学习方法进行学习。  (1)计划。  学习一定得有计划,尤其是要在两三个月时间内学习pmp这样的新体系,我们更应该把pmp考试作为一

j***n 10年前 上传497   0

PMP和PRINCE2的价值所在

PMP和PRINCE2的价值所在  我是项目管理专职讲师,很多学员朋友会问我同样的问题:“PMP和PRINCE2到底有什么区别?哪个含金量更高?”看来,这是所有要参加认证的朋友普遍关心的问题,我将根据自己的切身体会,从三个方面回答这个问题,希望共同探讨,对学员朋友带来帮助。  一、认证情况  1、PMP(项目管理专业人士资格认证)是PMI(美国项目管理协会)最有影响力的产品,PMBO

h***6 12年前 上传524   0

PMP学习笔记-沟通管理

PMP学习笔记-沟通管理沟通管理沟通是为了及时与恰当的生成、搜集、传播、存储、检索和最终处置项目信息所需的过程。它在人员与信息之间提供取得成功所必须的关键联系。PM需要花大量时间(75%-90%)与团队、客户、STAKEHOLDER和SPONSOR进行沟通。沟通是一个双向的过程。四个典型过程:沟通规划——确定STAKEHOLDER对信息与沟通的需求。信息发布——将所需信息及时提供给项目STA

d***l 10年前 上传462   0

PMP考试学习心得

PMP考试学习心得  我几乎都是利用自己的业余时间进行PMP和项目管理学习的,一般都在项目上很忙,时间时非常的宝贵的,我最初就是这样计划的,一定找一家让我省力气的、高效的培训班,这样我投入的精力也会少些,所以在选机构上花了大把时间考察。后来证明,这个过程的确是磨刀不误砍柴工,我筛选了几家培训机构之后,选了智鼎东方。  我把备考PMP就定义成一个项目,用项目管理的办法管理学习,整个备考过程

L***9 12年前 上传419   0

PMP考生关心的8大问题

1、选择题考试的可靠性如何? PMP选择题考试的可靠性很高!有些人认为四选一的选择题考试不可靠,这是对PMP考试的一个极大误解!随便弄出来的选择题考试,固然不怎么可靠。但,PMP考试的选择题是通过严格的科学研究过程开发出来的,所有题目都要经过从实验环境(相当于自然科学研究中的实验室)到真实考试环境的多种检测,所以PMP考试的题目具有足够的科学性和可靠性。2、PMP考试难不难?

d***s 11年前 上传548   0

您该选择PRINCE2或PMP认证

您该选择PRINCE2或PMP认证  您该选择PRINCE2 或 PMP认证?  很多人都问我,这是一个非常常见的问题,作为一个项目经理,他们是否应选择PRINCE2或PMP认证,因为这两个认证都是全世界非常流行的。  PRINCE2 是一个主要的全球化项目管理流程及方法,PMBOK 则基于框架与项目经理的技巧。它们两个采用不同的方法,但两者的目标都是提高项目执行或成功率。太多的项目

h***2 9年前 上传562   0

2002年PMP考试的一些信息

          2002年PMP考试的一些信息一、2002年PMP考试日期表考试日期3月23日6月22日9月21日12月7日报名截止日期1月15日4月12日7月12日9月30日提交材料截止日期1月18日4月18日7月18日10月4日退考截止日期2月15日5月13日8月2日10月30日缓考截止日期

z***2 14年前 上传453   0

PMP考试的100个关键点

1. 一个项目在启动阶段会进行量级估算,准确范围是-50至100%。2000版的量级估算准确度为:-25%到+75%。 参考:PMBOK2004 P161 CH P137 7.1 成本估算。 2. 质量控制通常先于范围确认执行,但这两个过程可以并列进行参考3. Cost-plus-fixed-fee(CPFF) 成本加固定费用合同。成本补偿型合同包括成本加固定费用(CPFF)、成本加

i***i 12年前 上传459   0

PMP考试模拟试题(40题)

考前模拟试题 Disclaimer: These questions are intended for study purposes only. Success on these questions is not indicative of success on the Project Management Professional Certification Examination. T

h***9 12年前 上传639   0

PMP(项目管理资格认证)介绍

 PMP(项目管理资格认证)介绍 PMP(Project Management Professional)指项目管理专业人士(人事)资格认证。美国项目管理协会(PMI)举办的项目管理专业人员(PMP)认证考试在全球190多个国家和地区推广,是目前项目管理领域含金量最高的认证。获取PMP证书,不仅提升项目经理的项目管理水平,也直接体现项目经理的个人竞争力,是项目管理专业人士身份的象征。

文***文 10年前 上传630   0

PMP考试技巧24计

PMP考试技巧24计 第1计 先调查,后决策例1:在新公司,你发现公司的一些财物报告没有遵照会计准则,所以并不准确,在这种情况下,你首先要做的是? A、将公司不准确的记账操作通知政府B、与你的财物经理沟通,告知他你为什么认为他们违反了会计准则C、既然你是公司的新员工,你假设公司的财务标准是不同的,所以不用采取任何行动D、与你以前的财务经理交流,对新公司的会计标准获得专家

j***8 9年前 上传450   0

pmp培训心得体会

pmp培训心得体会第一篇:pmp培训心得(一)pmp培训心得(一)一、 考pmp的原因我从事软件开发和管理工作已经十七年了。自从大学毕业以后,对于管理方面的知识我并没有进行过系统的学习。2014年,我曾在上海交大旁听过项目管理专业工程硕士的课程,发现对此很感兴趣,还买了pmbok(第三版)进行自学。但之后的工作中,由于所供职的企业并不是很重视项目管理,所以我的项目管理知识也只限于

n***y 12年前 上传774   0

基于PMBOK思想的房地产项目管理探讨

基于PMBOK思想的房地产项目管理探讨  引言  PMBOK(Project Management Body of Knowledge),是美国项目管理学会PMI(Project Management Institute)早在七十年代末率先提出的,发展到今天已经有30年的历史。国际标准化组织以该文件为框架,制订了ISO10006关于项目管理的标准。PMBOK中涉及到的项目管理知识领域划分

s***x 10年前 上传434   0

PMP项目管理模拟考试卷——5-科兹纳PMP模拟试卷

概述1、项目是一系列——的活动和任务。A、具有特定目标。B、具有明确开始和终止日期。C、资金有限(如果可用)。D、消耗资源。E、以上皆是。2、成功的项目管理可以被定义为——达到了项目管理目标。A、及时地。B、没有成本超支。C、在设计的性能/技术水平上。D、以上皆是。 E、只有A和B。3、项目管理的好处在于能够——辨别问题,从而产生——。

y***2 12年前 上传968   0

麦肯锡面试指南——咨询入门系列(4):McKinsey Guidelines for Case Preparation

McKinsey Guidelines for Case PreparationKellogg students who participate in McKinsey & Company’s Case Interview Workshops are usually asked to bring a prepared case to be used in breakout sessions

龙***生 12年前 上传501   0

团员自我评价2000字

团员自我评价2000字  只有经常地开展批评和自我批评,虚心地接受批评,才能不断地改造自我、提高自我、完善自我。敢于亮丑,严于解剖自己,是自我觉悟的表现,是进步的开始,得到的将是组织和周围同志的赞许和肯定;善意地、实事求是地指出他人的缺点和错误,是关心和帮助同志的善举,得到的将是同志的理解和感激;虚心地自觉地接受别人的批评,展示的是自己的宽广胸怀和知错就改的勇气,得到的也将会是自己的进步和同

信***飞 13年前 上传539   0

物流实习报告2000字

物流实习报告2000字  在本学期的期末,考试结束之后,学校组织了一次为期五天的实习活动。通过对一些知名、且具有代表性的企业的现场的参观,还有企业的代表对同学们的问题进行回答,使我们可以把课本上的内容与现实的生产流程两者相结合,对学习以及知识的理解与运用都有莫大的帮助。  (一)惠达陶瓷有限公司  基本概况:唐山惠达陶瓷(集团)股份有限公司始建于1982年。惠达集团拥有总资产11亿元

昂***号 23年前 上传672   0

测量实习心得 2000字

测量实习心得 2000字  测量学首先是一项精确的工作,通过在学校期间在课堂上对测量学的学习,使我在脑海中形成了一个基本的、理论的测量学轮廓,而实习的目的,就是要将这些理论与实际工程联系起来。测量学是研究地球的形状和大小以及地面点位的科学,从本质上讲,测量学主要完成的任务就是确定地面目标在三维空间的位置以及随时间的变化。在信息社会里,测量学的作用日益重要,测量成果作为地球信息系统的基础,提供

y***9 14年前 上传604   0