| 注册
home doc ppt pdf
请输入搜索内容

热门搜索

年终总结个人简历事迹材料租赁合同演讲稿项目管理职场社交

PMP考试模拟题(20个)

4***2

贡献于2015-11-08

字数:7657

Communications Sample Questions

1 Which of the following is not a process of Project Communcations Management
A Administrative Closure
B Performance Reporting
C Information Distribution
D Communications Planning
E Conflict Resolution

2 Which of the following are outputs from the Communications Planning process
A Project records
B Communications management plan
C Performance reports
D Formal acceptance
E b and c

3 The receiver filters messages based on all but the following
A Culture
B Semantics
C Language
D Distance
E Knowledge

4 How much time does the typical project manager spend communicating both formally and informally
A 4060
B 5070
C 6080
D 7590

5 In communications management to assimilate through the mind or senses is the process of
A Receiving
B Decoding
C Comprehending
D Understanding

6 The sending or conveying of information from one place to another is the process of
A Networking
B Transmitting
C Encrypting
D Promoting

7 Group brainstorming encourages all of the following except
A Team building
B Analysis of alternatives
C Convergent thinking
D Uninhibited verbalization

8 The three major types of communication are
A Written verbal and nonverbal
B Verbal formal documentation informal documentation
C Verbal written and graphic
D Verbal written and electronic

9 All of the following are outputs from performance reporting EXCEPT
A Trend analysis
B S curves histograms bar charts and tables
C Performance reports
D Change requests
E Stakeholder reports

10 All of the following aid in achieving consensus EXCEPT
A Maintaining a focus on the problem not each other
B Avoiding conflict
C Seeking facts
D Avoiding voting trading or averaging

11 All of the following are communication tools EXCEPT
A Memos
B Verbal circulation of a rumor
C Videos
D Body language
E Inputing data into a spreadsheet

12 Communication is the PRIME responsibility of a Project
A Manager in a weak matrix
B Manager in a projectized environment
C Coordinator
D Expeditor





13 A tight matrix is
A A balanced matrix organization
B Where all team members are brought together in one location
C Where functional managers operate in a dual reporting structure reporting to both
their own departments and to the project manager
D a and c

14 The sender is responsible for
A Confirming the message is understood
B Ensuring the receiver agrees with the message
C Scheduling communication exchange
D Presenting the message in the most agreeable manner

15 What are the four parts of the communications model
A Sending Receiving Decoding and Comprehending
B Sender Message Medium Receiver
C Communicator Message Receiver Decoder
D Communicating Transmitting Receiving Comprehending

16 A leadership style in which the project manager shares problems with team members and formulates solutions as a group is called
A Autocratic
B Consultation in a group
C Consensus
D Onetoone consultation

17 In negotiating with functional department managers project managers often find themselves using what twoparty conflict management approach
A WinLose
B WinWin
C LoseLose

18 A type of organization in which the project manager has little formal authority and basically acts as a staff assistant to an executive who is ultimately responsible for the project is called
A Functional
B Weak matrix
C Project coordinator
D Project expediter





19 Formal acceptance by the client or sponsor of the project should be preapred and distributed during which process
A Information Distribution
B Administrative Closeout
C Organizational Planning
D Performance Reporting

20 In which of the following organizations is the project manager role likely to be parttime
A Weak matrix
B Functional
C Balanced matrix
D a and b
E All of the above






























Contract Sample Questions

1 A unilateral contract under which the seller is paid a preset amount per unit of service is called
A A cost reimbursable contract
B A lump sum contract
C A unit price contract
D A fixed price contract
E b or d

2 Which of the following is considered during the Procurement Planning Process
A Whether to procure
B How to procure and how much to procure
C What and when to procure
D b and c
E all of the above

3 From a buyer's standpoint which of the following is true
A Procurement planning should include consideration of potential subcontracts
B Procurement planning does not include consideration of potential subcontracts since this is the duty of the contractor
C Subcontractors are first considered during the Solicitation Process
D none of the above

4 Which of the following processes involves obtaining information (bids and proposals) from prospective sellers
A Procurement Planning
B Source Selection
C Contract Administration
D Solicitation
E Solicitation Planning

5 Which of the following is true about procurement documents
A Procurement documents are used to solicit proposals from prospective sellers
B Invitation for Bid and Request for Proposal are two examples of procurement documents
C Procurement documents should be structured to facilitate accurate and complete responses from prospective sellers
D b and c
E all of the above
Contract Sample Questions cont

6 Which of the following is a method for quantifying qualitative data in order to minimize the effect of personal prejudice on source selection
A Weighting system
B Screening system
C Selecting system
D none of the above
E all of the above

7 Which of the following is true concerning evaluation criteria
A Can often be found in procurement documents
B Can be objective or subjective
C Used to rate or score proposals
D May be limited to purchase price if procurement item is readily available from number of sources
E all of the above

8 Which of the following are inputs to the Source Selection Process
A Evaluation criteria
B Organizational policies
C Procurement documents
D a and b
E all of the above

9 A significant difference between independent estimates and proposed pricing could mean that
A The independent estimates are most likely incorrect and the proposed pricing correct
B The SOW was not adequate
C The prospective seller either misunderstood or failed to respond fully to the SOW
D b or c
E a or c

10 Which of the following are examples of indirect costs
A Salaries of corporate executives
B Salaries of fulltime project staff
C Overhead costs
D a and b
E a and c



11 Which of the following contract types places the greatest risk on the seller
A Costplusfixedfee contract
B Cost plusincentivefee contract
C Fixedpriceincentive contract
D Firmfixedprice contract

12 In which of the following contract types is the seller's profit limited
A Costpluspercentagecost contract
B Costplusfixedfee contract
C Fixedpriceplusincentive
D b and c
E none of the above

13 A costpluspercentagecost (CPPC) contract has an estimated cost of 120000
with an agreed profit of 10 of the costs The actual cost of the project is
130000 What is the total reimbursement to the seller
A 143000
B 142000
C 140000
D 132000

14 A costplusincentivefee (CPIF) contract has an estimated cost of 150000 with
a predetermined fee of 15000 and a share ratio of 8020 The actual costs of
the project is 130000 How much profit does the seller make
A 31000
B 19000
C 15000
D none of the above

15 A fixedpriceplusincentivefee (FPI) contract has a target cost of 130000 a target profit of 15000 a target price of 145000 a ceiling price of 160000 and a share ratio of 8020 The actual cost of the project was 150000 How much profit does the seller make
A 10000
B 15000
C 0
D 5000

16 Under what circumstances is it better for a contractor to subcontract
A The subcontractor possesses special technical and engineering skills that the contractor does not have
B The work to be subcontracted represents almost all of the overall work effort
C The subcontractor can perform the work at a lower cost than the contractor
D all the above
E a and c

17 Which type of bilateral contract is used for high dollar standard items
A Purchase order
B Request for proposal (RFP)
C Invitation for bid (IFB)
D Request for quotation (RFQ)
E all of them are appropriate

18 Which of the following are characteristics of a purchase order
A A bilateral contract used for low dollar items
B A unilateral contract used when routine standard cost items are required
C A bilateral contract used for high dollar standard items
D a and c

19 In which stage of the negotiation meeting are points of concession identified
A probing
B closure
C agreement
D scratch bargaining

20 Which type of warranty is enacted if a service or product does not meet the level
of quality specified in the contract
A Implied warranty of merchantability
B Implied warranty of specified quality
C Express warranty
D none of the above











文档香网(httpswwwxiangdangnet)户传

《香当网》用户分享的内容,不代表《香当网》观点或立场,请自行判断内容的真实性和可靠性!
该内容是文档的文本内容,更好的格式请下载文档

下载文档,方便阅读与编辑

文档的实际排版效果,会与网站的显示效果略有不同!!

需要 2 积分 [ 获取积分 ]

购买文档

相关文档

PMP考试模拟题(28个)

Sample Professional Responsibility exam questions1.  While working on an external project your customer asks you to perform some additional tasks that are not included in the formal contract. You

h***9 10年前 上传590   0

PMP考试学习心得

PMP考试学习心得  我几乎都是利用自己的业余时间进行PMP和项目管理学习的,一般都在项目上很忙,时间时非常的宝贵的,我最初就是这样计划的,一定找一家让我省力气的、高效的培训班,这样我投入的精力也会少些,所以在选机构上花了大把时间考察。后来证明,这个过程的确是磨刀不误砍柴工,我筛选了几家培训机构之后,选了智鼎东方。  我把备考PMP就定义成一个项目,用项目管理的办法管理学习,整个备考过程

L***9 12年前 上传417   0

PMP考试的100个关键点

1. 一个项目在启动阶段会进行量级估算,准确范围是-50至100%。2000版的量级估算准确度为:-25%到+75%。 参考:PMBOK2004 P161 CH P137 7.1 成本估算。 2. 质量控制通常先于范围确认执行,但这两个过程可以并列进行参考3. Cost-plus-fixed-fee(CPFF) 成本加固定费用合同。成本补偿型合同包括成本加固定费用(CPFF)、成本加

i***i 12年前 上传457   0

2002年PMP考试的一些信息

          2002年PMP考试的一些信息一、2002年PMP考试日期表考试日期3月23日6月22日9月21日12月7日报名截止日期1月15日4月12日7月12日9月30日提交材料截止日期1月18日4月18日7月18日10月4日退考截止日期2月15日5月13日8月2日10月30日缓考截止日期

z***2 14年前 上传449   0

PMP考试模拟试题(40题)

考前模拟试题 Disclaimer: These questions are intended for study purposes only. Success on these questions is not indicative of success on the Project Management Professional Certification Examination. T

h***9 12年前 上传638   0

PMP考试技巧24计

PMP考试技巧24计 第1计 先调查,后决策例1:在新公司,你发现公司的一些财物报告没有遵照会计准则,所以并不准确,在这种情况下,你首先要做的是? A、将公司不准确的记账操作通知政府B、与你的财物经理沟通,告知他你为什么认为他们违反了会计准则C、既然你是公司的新员工,你假设公司的财务标准是不同的,所以不用采取任何行动D、与你以前的财务经理交流,对新公司的会计标准获得专家

j***8 9年前 上传449   0

PMP项目管理模拟考试卷——17-成都模拟题

1. To help the project team function more efficiently on complex and interrelated tasks, the project manager decides to use a war room. What does this mean?A. All the project records are kept in ma

y***l 12年前 上传433   0

PMP项目管理模拟考试卷——18-成都模拟题答案

模拟题答案1C21C41D61C81C2C22D42D62B82A3B23D43B63A83A4A24B44D64A84B5A25B45C65C85B6B26A46A

y***i 10年前 上传595   0

PMP学习心得

PMP学习心得  我参加的XX年1月的培训班,3月23日考试。成绩不算高但庆幸通过了,回顾整个学习,复习,考试各阶段,把自己的经验教训总结分享给各位同学。  01. 提前报名,课前通读一遍。    坦白说,我是属于笨鸟先飞的类型,12月中旬开始看pmbok,从第五章开始看,依据恒佳提供的打印版复习题为线索,根据问题在pmbok中找答案,把每章的问题都看一遍,在书中找一遍答案,基本pm

姜***8 10年前 上传597   0

pmp学习心得

pmp学习心得第一篇:pmp学习心得pmp考试心得三个月紧张而富挑战的pmp备考结束了, pmp考试也是一个理顺项目管理思路的过程,在知识点,尤其是职业道德的理解上要以pmp思路对待,重要的是理解pmi的概念和思想。同时也将如何进行项目管理的水平又提升到一个新的高度,发现了诸多平时工作中存在的问题,也对今后起到了指导与改正的作用,真正是受益匪浅。1. 学到的知识总结pmbok

w***i 10年前 上传507   0

PMP项目管理模拟考试卷——5-科兹纳PMP模拟试卷

概述1、项目是一系列——的活动和任务。A、具有特定目标。B、具有明确开始和终止日期。C、资金有限(如果可用)。D、消耗资源。E、以上皆是。2、成功的项目管理可以被定义为——达到了项目管理目标。A、及时地。B、没有成本超支。C、在设计的性能/技术水平上。D、以上皆是。 E、只有A和B。3、项目管理的好处在于能够——辨别问题,从而产生——。

y***2 12年前 上传966   0

PMP道德规范

PMI MEMBER ETHICAL STANDARDSMEMBER CODE OF ETHICS The Project Management Institute (PMI) is a professional organization dedicated to the development and promotion of the field of project ma

y***x 9年前 上传460   0

一次性成功通过PMP考试的备考经验交流

一次性成功通过PMP考试的备考经验交流  一、选择学习的方式  在短暂紧张的应考时间里,如何顺利通过PMP的考试?这就要在考试前做好充分的考前时间安排,做好应试的学习与复习计划。最好的应试策略就是组成一个学习小组,我们称之为应试项目小组。这样可以保障最佳的学习效果,同时也最大程度上避免了纯记忆形的学习方法,使得小组成员在学习和交流讨论的过程中得到最佳的理解,项目知识的学习最为扎实。成为应

娟***子 11年前 上传443   0

PMP应试六步法

1、 我们既然决定要去考 PMP,那就要做一些前期准备工作了,我自己事先在网上看一些关于 PMP 的一些资料,当然这些都是先了解一下,比如:什么是 PMI 协会、有关 PMP考试的相关信息、PMP 考试报名的相关条件、PMP 培训的机构等等,初步了解之后,就尽量早报名,这样可以早拿到资料和老师的提供的学习计划,这样可根据这些资料和老师的计划安排好自己的计划;  2、那么,接下来我来谈谈如

h***j 10年前 上传657   0

PMP Preparation Overview Updated for PMBOK 2000

PM AreaArea ProcessImportant Tools and TechniquesMajor Deliverables (Outputs)Process GroupOther NotesProject Integration Management – Processes required to ensure that the various element

f***e 14年前 上传617   0

PMP培训学习心得

PMP培训学习心得  section 1学习篇  pmp考试不是你背书有多厉害就能通过,而是重在理解。考试能获得越多的p,说明你对项目管理的理解就越接近pmi的思维理念。  两个月时间内,平均每天花3个小时看书,按照老徐的讲义和辅导书,结合自己的学习方法进行学习。  (1)计划。  学习一定得有计划,尤其是要在两三个月时间内学习pmp这样的新体系,我们更应该把pmp考试作为一

j***n 10年前 上传497   0

PMP和PRINCE2的价值所在

PMP和PRINCE2的价值所在  我是项目管理专职讲师,很多学员朋友会问我同样的问题:“PMP和PRINCE2到底有什么区别?哪个含金量更高?”看来,这是所有要参加认证的朋友普遍关心的问题,我将根据自己的切身体会,从三个方面回答这个问题,希望共同探讨,对学员朋友带来帮助。  一、认证情况  1、PMP(项目管理专业人士资格认证)是PMI(美国项目管理协会)最有影响力的产品,PMBO

h***6 12年前 上传521   0

PMP项目管理模拟考试卷——22-IPMA C级试卷

华鼎项目管理论坛 国际项目管理专业资质认证(IPMP) 知识考核笔试试题 级 别: IPMA C级 应试人员: 准考证号: 分 数: 阅 卷 人: IPMA国际项目管理专业资质认证中国认证委员会 试题1:(20分) 黄河机械公司是一家以

绿***踪 12年前 上传686   0

PMP项目管理模拟考试卷——23-IPMA D级试卷

华鼎项目管理论坛 国际项目管理专业资质认证(IPMP) 知识考核笔试试题 级 别: IPMA D级 应试人员: 准考证号: 分 数: 阅 卷 人: IPMA国际项目管理专业资质认证中国认证委员会 一、判断题 (每小题1分,共20分) 1.

d***3 12年前 上传1014   0

PMP项目管理模拟考试卷——16-2004.模拟考试试题

1. What are the 4 stages of team development?a. Assignment, kick-of, training, communicatingb. Forming, storming, norming, performing c. Direction, motivation, cooperation, collaboration d.

H***1 10年前 上传553   0

2023年职称日语考试模拟题精选6及答案

1、あの人はアメリカ人の留学生です。A.あの人は今、アメリカにいます。B.あの人は今、アメリカにいません。C.あの人は今、自分の国にいます。D.あの人は今、自分の家にいます。2、そこにある雑誌( )読んで、待っていてください。A、ごろB、でもC、ほどD、しか

公***够 4个月前 上传125   0

2023年职称日语考试模拟题精选1及答案

1、あの人はアメリカ人の留学生です。A.あの人は今、アメリカにいます。B.あの人は今、アメリカにいません。C.あの人は今、自分の国にいます。D.あの人は今、自分の家にいます。2、そこにある雑誌( )読んで、待っていてください。A、ごろB、でもC、ほどD、しか3、授業はもうすぐ始まります。A.授業はしばらくして始まります。B.授業は今始めたところです。C. 今、授業中です。D.授業はもう始まりました。

公***够 4个月前 上传129   0

2014银行考试行测模拟题

1. “只要知道自然界一切组成部分的相对位置和全部作用,一亿年以前的情况和一亿年以后的状况,都可以精确无误地演算出来,因为未来的一切早就在宇宙诞生时便已完全被确定了。”这是()。   A.唯心主义决定论的观点   B.辩证唯物主义决定论的观点   C.非决定论的观点   D.机械决定论的观点   2. “传统是一种巨大的阻力,是历史的惰性力,但由于它只是消极的,所以一定要被摧毁。”种

晓***咚 10年前 上传7609   0

2023年医学职称考试模拟题及答案

一。下列每一道考题下面有A、B、C、D、E五个备选答案。请从中选择一个最佳答案,并在答题卡上将相应题号的相应字母所属的方框涂黑。  [试题1]组成肌腱的主要组织是  A、疏松结缔组织  B、致密结缔组织  C、网状组织  D、脂肪组织

斛***雨 6个月前 上传161   0

电子政务考试模拟题(一)

一、单选题1、国家信息化体系建设中信息化的关键是哪一项(B)A家庭信息化 B政府信息化 C社区信息化 D企业信息化2、电子政务中,政务边际成本递减法则是指,社区管理的中间成本,社会管理范围扩大中(D)

w***7 7个月前 上传213   0